Conservation Biology Group | |||||||||||||||
|
Two
electrical pylons are corrected thanks to the pioneering work by
students of the Secondary School Cor de Maria (Valls, Tarragona)
The Secondary School Cor de Maria (Valls, Tarragona) started a pioneering work in order to reduce bird electrocution in power lines. In this work, students of 4th of ESO have begun a long-term monitoring of all electrical pylons in distribution power lines within the Alt Camp area, with help of the Agents Rurals, and writing down all impacts observed on the fauna. This work carried out by the students allowed to identify pylons where corrective measures should be implemented urgently and pylons where corrective measures had been already implemented but there were some technical problems to be solved in order to avoid bird electrocution effectively. With this information, the Conservation Biology Group of the University of Barcelona could contact with the electrical company Endesa, which has already implemented the correction measures in two pylons during March 2012.
|